Capacity Planning — Rack Utilisation and Power Density Analysis
Capacity Planning with Struktive
The Capacity Summary export provides a six-tab XLSX workbook for data centre capacity planning: Site Summary (EU EED), Rack Utilisation, Power Density, Category Breakdown, Data Quality Heat Map, and Cover.
What is included
- Rack utilisation by slot count (not U-height sum) — accurate for mixed-height environments.
- Power density per rack in W/rack — sourced from normalised power draw fields.
- Category breakdown — Compute, Networking, Storage, Power, Cooling distribution per site.
- Data quality heat map — score distribution across sites and racks.
- EU EED Annex I flag — sites exceeding 500 kW IT load threshold identified.